Wegovy GLP-1 Weight Loss Tracker

Glapp is a free Wegovy tracker app for iPhone, Android and web that logs your weekly semaglutide shots and dose steps, tracks weight and side effects, and compares your progress with STEP trial averages.

★★★★★ Rated 4.9/5 by users

Glapp control center showing the next shot, estimated medication level, weight change, and daily tracking

At a glance

Price
Free, with no trial and no card. Glapp Max is optional.
Works on
iPhone, Android and web, with one account.
Doses
0.25, 0.5, 1, 1.7 and 2.4 mg, plus Wegovy HD 7.2 mg, or a custom dose.
Schedule
Once a week, with reminders as your dose steps up.
Half-life
About 1 week. Glapp uses it to estimate your semaglutide level.
Ratings
4.8 on the App Store and Google Play, 4.9 on Trustpilot.

How Glapp Helps You Track

"I'm Not Sure if My Wegovy 1 mg Dose Is Effective"

Track how your injection works throughout the week. See when appetite suppression begins, when medication levels peak (typically 24-72 hours after shot), and how they taper off before your next weekly dose. Understanding your GLP-1 medication cycle helps explain changes in hunger, energy, and weight loss progress.

"Are These Wegovy Side Effects Normal?"

Monitor common side effects such as nausea, diarrhea, fatigue, and stomach discomfort. Glapp helps you identify what triggers symptoms after each shot and offers lifestyle recommendations grounded in official guidelines from the American Society for Nutrition (ASN), American College of Lifestyle Medicine, and the Obesity Medicine Association.

"I'm Not Losing Weight. What Should I Do?"

Some people experience a weight loss plateau on GLP-1 medications. Glapp analyzes your weight trends, appetite patterns, dose history, and medication levels to show what's working and what isn't. These insights can help you and your healthcare provider make informed decisions about dose changes, nutrition, and lifestyle factors.

"How Do I Follow the Wegovy Dosage Schedule?"

The treatment follows a gradual dose titration to help the body adjust to semaglutide. Track your weekly injections and dose from 0.25 mg to 0.5 mg to 1 mg to 1.7 mg to 2.4 mg, and receive reminders to stay on schedule.

How the Wegovy Weight Loss App Works

Track Wegovy Injections

Log weekly semaglutide shots, rotate injection sites, and record weight, appetite, mood, and all relevant metrics.

Glapp dark mode semaglutide shot log with dose, injection site, and date

Understand Your Body's Response

See real-time drug level curves and peak activity. Receive instant recommendations for side effect relief based on clinical data.

Glapp shot phases showing the weekly cycle and time until the next shot

Monitor Weight Loss Progress

Weekly charts display body weight changes on each dose. Track progress from starter dose to maintenance.

Glapp dark theme weight chart colored by semaglutide dose

Compare With Peers

Anonymously compare your weight loss journey to thousands of other users on the same Wegovy dosage.

Glapp progress chart comparing weight loss with peers

Glapp Is Loved by Thousands of Wegovy Users

★★★★★

"This was surprisingly good! I asked a few questions about plateaus and it gave well-founded, sensible, helpful answers."

John D. John D.
★★★★★

"The split between research and social insights is super helpful. That extra layer of perspective makes a big difference."

Sarah K. Sarah K.
★★★★★

"Love this. Really nice UX. Well done."

Robert M. Robert M.
★★★★★

"It's like having Reddit and PubMed combined in one clean answer."

Amy P. Amy P.
★★★★★

"I'm very impressed with that. Proper clever clogs!"

Maria L. Maria L.
★★★★★

"Amazing resource! Thank you so much!"

David H. David H.

Recommended by clinicians

"Glapp is the favorite app of our patients."

— Dr. Spencer Nadolsky

Wegovy Only vs. Wegovy+Glapp Benefits

❌ Forgetting shots
✅ Never miss a dose
❌ Nausea surprises
✅ Personalized relief tips
❌ Unpredictable appetite
✅ Hunger tracking made easy
❌ Mood swings
✅ Emotions linked to meds
❌ Fear side effects
✅ Early warning tracker
❌ Unsure what to eat
✅ Nutrition guidance tailored

Wegovy (Semaglutide) FAQ: Dosing, Side Effects, and How to Use

What's the best app to track Wegovy injections?

Glapp is a free GLP-1 tracker built by GLP-1 patients and health tech professionals, in collaboration with doctors. It logs your Wegovy shots, doses and injection sites, tracks weight and side effects, and shows an estimated medication-level curve and a comparison view against STEP trial averages. It is a tracking and educational tool; it does not replace your care team.

How does Wegovy help with weight loss?

Wegovy works by mimicking a hormone that targets areas of the brain involved in regulating appetite and food intake. This helps you eat less, which can lead to weight loss.

How long does Wegovy take to work?

Semaglutide reaches peak blood levels 1 to 3 days after an injection. Many people notice appetite changes within the first weeks, and weight change usually becomes visible over one to three months as the dose steps up toward 2.4 mg. In the STEP 1 trial, average weight loss at 68 weeks was about 15%, versus about 2% with placebo. Individual results vary; tracking helps you see your own pattern, it does not change the medication's effect.

How does Wegovy compare to Ozempic?

Both are semaglutide-based, but Wegovy is dosed higher for obesity treatment: up to 2.4 mg, or 7.2 mg with Wegovy HD. Studies show Wegovy often achieves greater weight loss due to higher maintenance doses.

How do you inject medication using the Wegovy pen?

Wegovy is injected once weekly using a single-dose prefilled pen. To use the pen, clean the shot site with alcohol, remove the pen cap, press the pen firmly against the skin, and hold it in place until the shot is complete. The medication is delivered automatically once the pen is activated.

Where should you inject Wegovy?

The injections are typically given in three areas of the body: abdomen (stomach area), upper thigh, and upper arm. Rotating shot sites each week helps reduce irritation and lumps under the skin. Avoid injecting into areas that are bruised, tender, or scarred.

Does Wegovy make you tired?

Some people report fatigue or low energy when starting a GLP-1 receptor agonist or increasing the dose. This may occur as the body adjusts to semaglutide, changes in appetite, or reduced calorie intake. Fatigue usually improves after the first few weeks of treatment, but if it persists, speak with your healthcare provider.

How much does Wegovy cost?

The price varies depending on insurance coverage, pharmacy pricing, and manufacturer discounts. In the United States, the retail cost can exceed $1,000 per month without insurance, although many patients pay significantly less with insurance plans or savings programs. Your healthcare provider or pharmacy can help determine the exact cost based on your coverage.

Can I start at 1.7 mg?

No. Wegovy treatment typically begins with a low starting dose of 0.25 mg to allow the body to adjust to semaglutide. The dose is gradually increased every four weeks through a process called dose escalation. Starting directly at 1.7 mg is generally not recommended because it may significantly increase the risk of nausea and other side effects.

Can I start Wegovy at 0.5 mg?

Most treatment plans begin at 0.25 mg once weekly for the first four weeks before increasing to 0.5 mg. Starting directly at 0.5 mg is sometimes possible depending on clinical circumstances, but this decision should always be made by a healthcare provider.

Does Wegovy need to be refrigerated?

Yes. The injection pens should normally be stored in a refrigerator between 36°F and 46°F (2°C to 8°C) before use. Keep the pen in its original carton to protect it from light and avoid freezing the medication.

How long can Wegovy stay out of the fridge?

The drug can be kept at room temperature (below 86°F / 30°C) for up to 28 days after being removed from refrigeration. If the medication has been left out longer than this period, it should not be used. Always check the manufacturer's storage instructions before using the pen.

How long does Wegovy stay in your system?

Wegovy contains semaglutide, which has a long half-life of about one week.